Rapid-air CUT-TO-LENGTH WITH MULTI-STROKE Manuel d'utilisateur Page 30

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 58
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 29
Cut to Length with Multi Stroke Program
ROLLER AND GEAR BOX ASSEMBLY
At this stage of disassembly, all field maintenance components are exposed
and easily accessible. No further field service should be necessary on the
roller and gear box assembly unless the gear train is suspected of a
malfunction. The drive rolls should be checked for erronious wear pattern
while they are exposed and cleaned before reassembly.
MAINTENANCE PROCEDURES
DAILY WEEKLY
MONTHLY
Wipe off feed rolls Check wear pattern of rolls Check oil
level
Clean any dirt from Check
cables for cuts
servo unit or wear
Clean any dirt from
operators pendant
file:///C|/Web_develop/cut_to_length_with_multi_stroke_.htm (29 of 66) [12/10/2001 3:44:57 PM]
Vue de la page 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 57 58

Commentaires sur ces manuels

Pas de commentaire